tl;dr: I testify in support of the plan for Merriweather Park at Symphony Woods and the Planning Board approves it (note: correlation is not causation), Inner Arbor haters gonna hate, and Brad Canfield of Merriweather shocks me. I was fortunate enough to be able to attend and testify at the Howard County Planning Board meeting last night at which the Board unanimously approved site development plan SDP-14-073 [PDF] for Merriweather Park at Symphony Woods, the project otherwise known as the Inner Arbor plan. Here’s a lightly-edited copy of my testimony: ...

2014-11-21 · 6 min · Frank Hecker

Chrysalis designer wins World Architecture News 21 for 21 award

The Chrysalis in Symphony Woods / Merriweather Park in the Inner Arbor plan. (Click for high-resolution version.) Image © 2013 Inner Arbor Trust; used with permission. Marc Fornes, the designer of the Chrysalis, the amphitheater planned for Symphony Woods as part of the Inner Arbor plan, and his firm THEVERYMANY are one of two winners of the 2014 WAN 21 for 21 award sponsored by World Architecture News, “an initiative aiming to highlight 21 architects who could be the leading lights of architecture in the 21st century.” ...

2014-06-30 · 4 min · Frank Hecker

Renovating Merriweather Post Pavilion: The schedule

In this post I look into the current schedule for the proposed Merriweather Post Pavilion renovations. For background information see part 1 and part 2 of my discussion of the renovations themselves and their budgeted costs. Recall again that the costs and dates for the renovations are laid out in Exhibits A and B of Amendment 2 to Amendment 12 [PDF] to Council Bill 24-2014. The proposed renovations are based on (but not identical to) the set of renovations described in the recent draft 2014 Ziger/Snead Merriweather Post Pavilion Physical Review Update [PDF], which updated the Ziger/Snead report included in the 2005 final report of the citizens advisory panel on Merriweather Post Pavilion [PDF]. ...

2014-05-30 · 6 min · Frank Hecker

On the Inner Arbor plan, listen to the people, not the protestors

Last night I went to Columbia Association headquarters for the CA board meeting that had been scheduled on very short notice to discuss the Inner Arbor plan. Due to family commitments I had to leave before the main part of the meeting, but I was able to be there long enough to participate in the “resident speak-out” and say my piece: Good evening. My name is Frank Hecker. I’m currently a resident of Ellicott City, and I’ve been a member of various Columbia Association programs. I’ve also blogged extensively about the Inner Arbor plan, and I’m a strong supporter of it. However I’m not here tonight to talk about my thoughts on the Inner Arbor plan; you can go to frankhecker.com if you want to read those. Instead I want to talk about other peoples’ opinions of the plan. ...

2014-05-29 · 4 min · Frank Hecker

Renovating Merriweather Post Pavilion: Projects and costs, part 2

I continue my look into why the Merriweather Post Pavilion renovations are necessary, exactly what is proposed to be done, and how much each set of projects will cost. I conclude with the remaining categories of projects, which consume the other half of the total renovation budget. Recall from my last post that the costs and dates for the renovations are laid out in Exhibits A and B of Amendment 2 to Amendment 12 [PDF] to Council Bill 24-2014. The proposed renovations are based on (but not identical to) the set of renovations described in the recent draft 2014 Ziger/Snead Merriweather Post Pavilion Physical Review Update [PDF], which updated the Ziger/Snead report included in the 2005 final report of the citizens advisory panel on Merriweather Post Pavilion [PDF]. ...

2014-05-27 · 7 min · Frank Hecker

Renovating Merriweather Post Pavilion: Projects and costs, part 1

By now everyone knows that Merriweather Post Pavilion will be renovated and Howard County is helping to pay for it. In this post I dive a bit more into why the renovations are necessary, exactly what is proposed to be done, and how much each set of projects will cost. I start with the three largest categories of projects, which together will cost over $10 million, or over half the total renovation budget. ...

2014-05-26 · 9 min · Frank Hecker

A better plan for Symphony Woods

Some people are now promoting the Paumier plan as a way to “save Symphony Woods.” But two years ago people concerned about preserving Symphony Woods were signing a petition against the Paumier plan and calling instead for “a unique park with meandering pathways that connect amenities and honor the natural woods.” They couldn’t know it then, but those petitioners were asking for the kind of Symphony Woods park that will be provided by the current Inner Arbor plan. ...

2014-04-23 · 9 min · Frank Hecker

How not to save Symphony Woods

After discussing the characteristics of the previous Cy Paumier plan for Symphony Woods it’s time for my verdict. Spoiler alert: It’s not favorable—not a horrible plan, but one whose key design choices left it flawed in several ways. Since I finished up with tree removal in my last post, I’ll start with it here. As I noted previously, the number of trees requiring removal is dependent on the exact version of the Paumier plan being discussed, and was inflated by the choice of formal rather than meandering walkways in the design. In his rally announcement to “save Symphony Woods” Paumier quoted a figure of 30 trees requiring removal, which is ostensibly one lower than the Inner Arbor estimate (but see below) and substantially lower than the figures of 50 to 60 or more trees presented to the Howard County Planning Board and documented in Paumier’s own 2012 letter to the Baltimore Sun. The key point here is that Paumier has abandoned the 2011 and 2012 versions of the plan that the Columbia Association submitted to the Howard County planning process, and is referencing an older version of the plan from 2009, a version the CA board decided later to revise. ...

2014-04-19 · 10 min · Frank Hecker

Looking back at the Paumier plan for Symphony Woods

Proposed pathways and other features of the 2012 version of the Symphony Woods plan from Cy Paumier and associates. Click for high-resolution version. Adapted from sheet 3 of FDP-DC-MSW-1, Downtown Columbia Merriweather-Symphony Woods Neighborhood Final Development Plan. ...

2014-04-18 · 6 min · Frank Hecker

GGP, CA, Cy Paumier, and the battle over Symphony Woods

After walking in Symphony Woods last weekend I wondered again how the woods might best be preserved and enhanced for everyone in Columbia and Howard County to enjoy. This weekend former Columbia planner Cy Paumier will be heading into Symphony Woods himself to promote a plan to “save Symphony Woods”—essentially an attempt to revive support for his own Symphony Woods design, originally proposed in 2008. That design was the Columbia Associations’s preferred proposal for Symphony Woods for quite a while, and plans based on it went partly through the Howard County planning process before receiving criticism from the Howard County Design Advisory Panel and Planning Board and then being rejected by the CA board in favor of the Inner Arbor plan. Since Paumier’s plan has been recently and repeatedly brought up by people opposed to the Inner Arbor plan I thought it was worth a closer look, if only to highlight why (in my opinion) the Inner Arbor plan is superior. ...

2014-04-17 · 6 min · Frank Hecker